Weekend Update

Work continued on planting up the boarders, baskets and containers with bedding plants, this year we are to try hanging baskets to see how they will cope watering wise with only getting to visit the station twice a week keeping hanging baskets watered is a concern. Work also commenced on thinning out areas of the platform embankment and attempting to identify the plants we have. Where possible the intent is to create additional plants from the thinning out exercise for planting on elsewhere in the station grounds. There are several different varieties of geraniums along the embankment and its hoped we can create areas that will show them off better in years to come.

Stalwart diesel 27001 returning from Manuel with the empty SRPS coach stock used on

Blooming Ech!!

Not only have we had some fine weather to get the group back into the gardening spirit after the DOWT weekend, we also had the famous Scot visiting too!!.  For the last couple of weeks we have had 60103 the Flying Scotsman stabled down at Bo’ness and so for the 2nd time in the month we managed to capture the Scotsman passing through Birkhill adding to our 2019 visitors gallery.

Anyway less of the train spotting and back to the business of maintaining the station. Summer planting has been the order of the day for the last couple of weekends planting up containers and weeding out the embankment. We are going to start to thin out some of the planted areas to create some form of structure to the planting which, over time will improve the appearance.

The Monday squad has also been back in action, back filling behind the 2nd platform wall in preparation for the landing of the new footbridge in a couple of weeks weather permitting.

DOWT Prep Work

This weekend the vast majority of the time was preparing (bunting hanging & grass cutting was done ) for the 1st of this years ‘Days out with Thomas’ weekends (11 & 12th May), so very little work took place on the North British Coach recladding project other than thinking of the next steps over a cup of coffee.

We also got our first 2019 visitor at the station – A4 No. 60009 Union of South Africa which was stabling at Bo’ness in between Rail tour excursions. 60009 along with CR No. 419 worked together on today’s bank holiday services as can be seen in the pictures below and also on the Gallery page – Station Visitors 2019

Weekend Update

Now that the platform side of the grounded North British Coach has been fully cladded & painted with primer, work commenced on the embankment side of the coach. As found already many of the door hinges are no longer in situ, however the timbers on this side do appear to have been protected better and are in many places remarkably still solid as we stripped off the old cladding.  Its recent history of being a medical facility is also visible which is nice to see!  Usual process followed, remove cladding, old nails, clean off as much of the prime as possible, and apply wood preservative, and new weatherboard timbers secured to standoff timbers.

Work on the coach will slow down over the next couple of weeks with the build up to the first ‘Days out with Thomas’ but we hope to complete the cladding replacement work before the end of May.

Another day volunteering

Seeing all the spring bulbs in full bloom makes all the time clearing leaves on the embankment during the cold winter months all worth it but the Birkhill team doesn’t just do leaf clearing & weeding we can do other things too!

Work continued on the recladding of the North British grounded coach body this weekend, whilst one of us painted the new cladding section rears, the other, scrubbed down the old the timber frames of decades of cobwebs, dust, decaying wood, nails of all varieties before treating with a good dollop of wood preserver. Having inspected the timbers we decided to do the next phase of cladding in two sections with the hope of the last section being brought back to what it may have looked like when it was in use many years ago- but that will be for another time.

The Monday squad have all but completed the west platform retaining wall around the foundations of the new footbridge – looking a lot tidier now lads well done!

Busy week up at Birkhill

Work re commenced on the 120 plus year old grounded North British 3rd Class 6 wheel carriage circa 1890-99. Due to time constraints we have decided to strip off the old cladding a section at a time using the new weatherboard lengths as a measure to how far we can get in a shift. The old wood did not give up much of a fight, but the way it had been previously fitted quickly revealed the lack of protection it had actually given to the lower sections of the coach frames. As previously reported the floor condition was known to be bad but the water ingress behind the old boards from the coach window down has taken its toll. Once all the old wood had been removed the frame was brushed down and painted with wood preserve to help save certainly the upper timbers. Because of the damage caused by the water ingress we decided to fit the new cladding on stand offs which we hope will give it a water tight covering and at the same time provide a small gap to allow the timbers to dry out completely. A new project page on this website will be put together shortly to provide a pictorial view of work done to protect the carriage a little longer until it can be restored to its former glory!

Meanwhile the Monday squad have continued there great job in building the retaining wall around the footbridge foundations on the West Platform, we are looking forward to its completion so that we can hopefully get it ready for summer planting.

 

 

We Just Love to Paint

As the finishing touches was done to the outside front of the station building work commenced on the Exhibition Room floor. Every year it gets painted, but all to easily flakes after a couple of months of use.  This year we are trying an Industrial strength paint expensive but hopefully the epoxy based paint with anti-slip qualities will last at least one running season, but only time will tell!

 

 

 

Weekend Update

The station exterior has not seen a lick of paint for 4 years and as its the 30th anniversary of the station’s opening this coming May we thought it was time to spruce up the front of the station weather permitting that is. Keeping with the same colour scheme we started with the gantry’s before moving onto the front of the building proper.

The Diggers Move In!

Work has commenced on bridge foundation embankment retaining wall on the West Platform by the Monday squad. The use of the mini digger saved valuable time digging out the wall foundations . The plan is to get the wall built over the next few weeks weather permitting whilst the bridge upright refurb is being completed.