Back to Full Strength

Now that we are two Amigos strong again, work picked up pace on the final tidy up of the West Platform embankment, clearing the last of the leave, branches and moss to help the many bulbs to develop and hopefully put on a good show in the coming weeks. Work focused behind the Lamp Hut and the embankment above the foundations of the new footbridge.

The snow drops are showing particularly well this year a lot better spread than previous years so we must be doing something right!  With the warm weather though, we are a tad concerned that we will be the only ones to witness the spring splendour as the first running of the new year is not until late March!

Weekend Update

The station freshen up commenced this weekend with the painting of the waiting room floor, there is a little bit of touching up to be done on the walls but apart from that the room is now looking okay so we can now focus on the exhibition room floor before tackling the exterior paintwork which is now looking very tired indeed.

 

Work continued on the west platform embankment tidy up either side of the new bridge foundations and to the left of the grounded NB coach. A good clear up has resulted in finding more spring bulbs that have either struggled or not made it through the over growth and leaves in previous years

Meanwhile during the week the Monday Squad continued with the bridge foundations but this time on the east side. The weather has been very kind to date so progress is going well.

Its February Already!!

Its been  cold end to January, but this has not stopped work at Birkhill!

The Monday Squad have been busy concreting in the footbridge shutters on the West Platform- https://www.srpsbirkhillgroup.org.uk/?page_id=1031 and replacing worn out sleepers, whilst the Birkhill team have been working on the station garden and exhibition room floor.

Every year the paint lifts and cracks and is either due to the concrete, not enough paint who knows! So we have decided to scrape the surface layer of paint to see if we can get to the bottom of the lifting, some of the worst areas appears to have an uneven ‘dimple’ affect (probably from the small pieces of aggregate used in the original laying of the concrete) so as its walked on, the paint quickly wears away. Fingers crossed that we find a solution this year as the old knees are struggling on the cold floor and it is a chore not needed!

January Activity

Apart from a couple of cold and frosty days the weather has been kind and has enable several good sessions on tidying up the West Platform embankment, the station garden, the signal-box grounds and the ramp area just beyond the gates.  Many of the bulbs are showing there heads since clearing the leaves away so all our fingers are crossed that we don’t loose them in any future freeze like we saw last year with the ‘Beast of the East’.

Yesterday was spent chopping back the overgrowth that had developed on the East embankment it just had to be done! Until the start of the second platform construction we have only spent a limited amount time and effort on keeping it tidy, but the overgrowth had just got to unsightly and something had to be done (looking across from the benches at brambles, weeds etc …well there is only so much you can take whilst having a coffee!)

Meanwhile work has recommenced on the footbridge foundations, while the pillars are strengthened and painted. It is hoped that the bridge will be in situ soon.

 

Weekend Update – Year End

Well that’s another year over with, Santa has been and gone and the decorations have been taken down its back to clearing the leaves away from the platform embankment, we have already managed to cut back the bushes on the signal box embankment and looks a lot better, but a little more work is necessary there too.

Other News!!

The Gallery page has been updated to include pictures and video’s of the visitors from the Caley Reunion and the Diesel Gala of yesterday.

There is movement on the new signal box for Birkhill with the Winter Appeal 2018 being launched in the latest Blastpipe.

 https://mydonate.bt.com/events/birkhillsb/478518

The ex West Calder footbridge has been painted and taken to Bo’ness ready for it to be shipped up to Birkhill and installed hopefully by the spring and in time for the station’s 30th anniversary

Caledonian Steam Gala Weekend

One of the pleasures of volunteering at Birkhill along with the hard graft is being able to get to see visiting engines and the Cala event was one of those pleasures. Below are a couple of pictures taken whilst bulb planting. More pictures will be added to the Gallery page in due course.

Now back to the bulb planting!

 

First Frost

With an extra layer of clothing work continued on the NB Coach roof protection. The temporary sheets which overlapped each other and so let water through during heavy rain have now been replaced with a full length thick membrane to see out the winter and keep the recently sanded down roof timbers and interior dry until such time the damaged roof supports can be replaced.

Remedial works has started on sections of rotten wood on the outside of the station, the first of the new timber sections have been expertly copied and put in place and once painted everything will look as good as new!

Weekend Update

Autumn tasks commenced this weekend cutting back and deadheading plants & bushes, the cold nights has started to take its toll on the leaf’s but we decided to leave the sweeping up until the majority have fallen (for now at least!).

Another task done was the installation of a couple of period drop lights in the waiting room, the cable will eventually be placed in small boxed conduit to keep everything tidy.

Roof Sanding Complete!

We took full advantage of a glorious sunny autumn day to complete the sanding down of the North British coach body roof and covered it with two generous coatings of preservative. The next challenge is to clean out the remaining items inside the coach so that we have sufficient room to identify a way of lifting the roof section that has unfortunately sagged and led to the water ingress.

Coach Works Continues

After our exploits at Manuel, we are now back working on the North British Coach Body. All the roof has been cleared of all the old felt, 50% of the old timbers have been sanded down and coated with wood preserver. Temporary lights have been fitted inside the coach and cleared as much as possible of the many years of rubbish dumped inside.  A lot of wood was also present which was identified as being part of the signal-box this has been moved into the storage container ready for when the building of the signal-box commences.

14:10 from Bo’ness to Manuel AGM Special arriving at Birkhill on 22nd September