Birkhill Group Goes on Holiday!

It was flagged up that the access paths at Manuel had become badly overgrown so as we had the tools and where closer to Manuel than the guys at Bo’ness we decided to take a holiday for a few weeks. So armed with strimmer’s, shears, rakes and flasks of coffee, we have spent the last few shifts cutting back and removing what felt like years of growth.  The steps up to the main road where particularly overgrown and needed a good couple of shifts to make good again but now look a lot better now

We are not sure we have by default adopted Manuel into the Birkhill Group activities but it was a nice change to take the train up and have a change of scenery and will look at slotting in further trips to keep on top of things!

Weekend Update

Work continued on stripping back the roof of the North British coach body, most of the old felt protection has now been scraped away. It was nice to find that vast areas the wood is in very good condition, considering it is over a 100 years old!

Birkhill Coach Works Update

After visually inspecting the inside of the coach it became quickly apparent that years of being brushed by the tree branches the roof at the centre was in a poor state and make the coach water tight again was a priority before the autumn and winter months.  Work commenced on removing several layers of roofing felt, not a nice job but someone has to do it as the saying goes! trees and other plants had taken root in between the layers which did not help matters.

Birkhill – NB Coach

Many of you who visit Birkhill regularly will have noticed, over the years, the deterioration of the North British Coach body  especially the cladding and its roof protection. Well after discussing with the societies ‘powers at be’ the Birkhill Group have decided to take on the replacement of the cladding and roofing felt. The work is going to take many weeks and is certainly weather dependant, but hopefully the work will help save this 6 wheeled 3rd class historical coach body from further wear and tear and who knows what we will find and be able to do!

It is the intent to document the work on the web site as a mini project in pictures with brief updates within the regular posts.

Roof of Coach

DOWT Prep & Rockery Clearance

The next DOWT weekend (28-29th July) is fast approaching and so it was time to get out the strimmer’s and tidy up the car park area ready for the marque to be erected. Bunting & banners will be installed during the week leading up to DOWT.

The new rockery area at the Lamp Hut end of the platform has now been completed. Its just a waiting game now to ensure we have managed to clear out all the weeds before replanting with alpine and other rockery plants.  

Weekend Update – Birkhill Rockery Project

Whilst finishing off the kerbstone laying project it was noticed that the embankment area immediately adjacent to the Lamp Hut was a mess, covered in weeds, saplings and other vegetation, so while the pick axe and forks where still hot we commenced the clearance of the 4m x 4m section of embankment to eventually establish a rockery….well if we can find plants that will grow in the extremely poor soil conditions!!

Meanwhile the Clay mine hutch got a lick of primer / rust inhibiter

 

Kerbstones Laid

After 4 back breaking sessions and endless swatting of the little black flying beasties the kerb along the south end of platform 1’s embankment has now been completed. Hopefully it has tidied the embankment edging and reduce the muddy puddles that develop in the Autumn and winter months. Once it has had time to settle we will review what can be done from a planting point of view for the 2019 growing season along the whole of this section of the embankment.

Birkhill Progress

on 25th June, the Monday squad was back in action and have now poured the concrete for the footbridge foundations, the last remaining section of the 2nd platform and also for the signalling system at the north end of the new platform.

The squad  was also kind enough to deliver a couple of dozen surplus kerbstones from the yard down in Bo’ness for the Birkhill Group’s next mini project at the south end of platform 1. The intent is to create an edging to the embankment, however, with the glorious hot weather moving and positioning the stones into place is a challenge but the kerb edging is progressing despite the heat and little swarms of flies ‘we’ appear to attract!

 

Strimming & Striping – Weekend Update

Two jobs completed over the course of the week – Whilst we continue to be blessed with lovely sunny weather we continued with the grass cutting exercises and cut back the overgrowth on the embankment just north of the bridge along back towards Bo’ness to the 20 mph sign.

The station hutch (Birkhill Clay Mine) has now been completely stripped down to the base so that the ironwork can be cleaned up and repainted and new timbers can be eventually sourced to replace the rotten sections. Thankfully the engraved sections of wood are in a good enough condition to save and refit along with a few other sections, however 75% of the timbers are to far gone.  The removal of the nuts was a task and a few choice words where used at times, but the ‘bolt splitter’ tool made sufficient impression to allow the nuts to be removed.

 

Meadow Elve’s

On a really wet Saturday morning it was with a pleasant surprise to see that the meadow walk path had been cut back a metre or so either side – all the way round and including the picnic table areas. We are still none the wiser who kindly did the work, but on behalf of the Birkhill Group we would like to say thanks as it has saved us a lot of work. We still had some work to be done around the mine picnic area but we did not let the rain put us off clearing the leaves and cuttings, still a little more work to be done to clear the weeds …..again…. from the garden boarder but hopefully this will be completed in the near future. So whoever did the strimming ….. thank you from the team.