Lamp Hut Project

Over the last couple of shifts work has progressed well on the prep work on the Lamp Hut, temporary lighting has been installed, interior cleared completely and frame supports installed to support the upper sections of the sides to enable the lower rotten sections to be removed once replacement timbers to sourced.

During the more detailed survey at the last shift it came apparent that a minimum of 900mm around the base of the hut will need to be replaced.  As the Vertical corners where examined it was interesting to see how many layers of paint the hut has had over the years!