As the heavens opened and quickly filled the water buts, work focused on the inside of the hut where a start was made on the painting of the interior, fingers crossed for better conditions for the next shift.
On a separate note the Civils ‘Monday Squad’ have made a start on preparing the land along the second platform and the access to it. The prep work is required before the spoil can be removed to enable the levelling out of the land in readiness to re start the platform build work.