{"id":914,"date":"2017-11-18T17:56:55","date_gmt":"2017-11-18T16:56:55","guid":{"rendered":"http:\/\/www.srpsbirkhillgroup.org.uk\/?p=914"},"modified":"2017-11-21T11:44:21","modified_gmt":"2017-11-21T10:44:21","slug":"2nd-platform-update-2","status":"publish","type":"post","link":"https:\/\/www.srpsbirkhillgroup.org.uk\/?p=914","title":{"rendered":"2nd Platform Update"},"content":{"rendered":"<p>The Monday \/ Civils squad where out in force again during the week, focus was on the next pour of 4 sections one of which was to join up the two at the proposed footbridge is to be installed. Once set it will allow the footbridge foundation work to start.<\/p>\n<p>Also taking place is the replacement of worn out sleepers along the loop section. The sleepers, many came from Kincardine Power Station and Livingston back in the early 80&#8217;s have suffered by the soggy conditions over the past 20 plus years.<\/p>\n<p><a href=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-Platform-18112017-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-915 alignleft\" src=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-Platform-18112017-1-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-Platform-18112017-1-300x168.jpg 300w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-Platform-18112017-1-768x431.jpg 768w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-Platform-18112017-1-1024x575.jpg 1024w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-Platform-18112017-1.jpg 1632w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a> <a href=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-platform-18112017-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-916 alignleft\" src=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-platform-18112017-2-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-platform-18112017-2-300x168.jpg 300w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-platform-18112017-2-768x431.jpg 768w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-platform-18112017-2-1024x575.jpg 1024w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2017\/11\/2nd-platform-18112017-2.jpg 1632w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Monday \/ Civils squad where out in force again during the week, focus was on the next pour of 4 sections one of which was to join up the two at the proposed footbridge is to be installed. Once set it will allow the footbridge foundation work to start. Also taking place is the &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.srpsbirkhillgroup.org.uk\/?p=914\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;2nd Platform Update&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-914","post","type-post","status-publish","format-standard","hentry","category-station-news"],"_links":{"self":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=914"}],"version-history":[{"count":2,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/914\/revisions"}],"predecessor-version":[{"id":918,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/914\/revisions\/918"}],"wp:attachment":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}