{"id":1095,"date":"2018-02-13T11:49:47","date_gmt":"2018-02-13T10:49:47","guid":{"rendered":"http:\/\/www.srpsbirkhillgroup.org.uk\/?p=1095"},"modified":"2018-02-13T11:49:47","modified_gmt":"2018-02-13T10:49:47","slug":"platform-2-update","status":"publish","type":"post","link":"https:\/\/www.srpsbirkhillgroup.org.uk\/?p=1095","title":{"rendered":"Platform 2 Update"},"content":{"rendered":"<p>The Monday crew along with the works train was up at Birkhill again to remove the shutters to recently poured north ramp, all remaining shutters have now been recovered leaving just the South facing ramp to complete. Work continues on the preparation of the footbridge foundations on both sides of the ramp which will be the main focus for the next few weeks.<\/p>\n<p><a href=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-North-Facing-Ramp.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1096 alignleft\" src=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-North-Facing-Ramp-200x300.jpg\" alt=\"\" width=\"200\" height=\"300\" srcset=\"https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-North-Facing-Ramp-200x300.jpg 200w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-North-Facing-Ramp.jpg 513w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/a>\u00a0<a href=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-train-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1098 alignleft\" src=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-train-2-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-train-2-300x201.jpg 300w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-train-2-768x514.jpg 768w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-train-2.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>\u00a0<a href=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-Train-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1097 alignleft\" src=\"http:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-Train-1-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-Train-1-300x201.jpg 300w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-Train-1-768x514.jpg 768w, https:\/\/www.srpsbirkhillgroup.org.uk\/wp-content\/uploads\/2018\/02\/12022018-Works-Train-1.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Monday crew along with the works train was up at Birkhill again to remove the shutters to recently poured north ramp, all remaining shutters have now been recovered leaving just the South facing ramp to complete. Work continues on the preparation of the footbridge foundations on both sides of the ramp which will be &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.srpsbirkhillgroup.org.uk\/?p=1095\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Platform 2 Update&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1095","post","type-post","status-publish","format-standard","hentry","category-station-news"],"_links":{"self":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1095"}],"version-history":[{"count":2,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1095\/revisions"}],"predecessor-version":[{"id":1100,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1095\/revisions\/1100"}],"wp:attachment":[{"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.srpsbirkhillgroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}