Home / Station News / Coach Works Continues

Coach Works Continues

After our exploits at Manuel, we are now back working on the North British Coach Body. All the roof has been cleared of all the old felt, 50% of the old timbers have been sanded down and coated with wood preserver. Temporary lights have been fitted inside the coach and cleared as much as possible of the many years of rubbish dumped inside.  A lot of wood was also present which was identified as being part of the signal-box this has been moved into the storage container ready for when the building of the signal-box commences.

14:10 from Bo’ness to Manuel AGM Special arriving at Birkhill on 22nd September